Plenitude Morsianocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Il segnale telefonico va e viene, per cui bisogna indovinare il momento giusto per passare la card o usare l'app perché la colonnina stessa si connette e disconnette. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-plenitude-22-kw-villa-minozzo-re-via-domenico-bondi-1-morsiano-t40583.html
https://www.forumelettrico.it/forum/colonnina-plenitude-22-kw-villa-minozzo-re-via-domenico-bondi-1-morsiano-t40583.html Comment by ForumElettrico.it 01/06/2025 07:49:33
Other Charging Locations
There are 9 matching results
Be Charge Cinquecerri
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Cerreto Laghi
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Busana
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Plenitude Ligonchio
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Cervarezza
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Cervarezza
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Plenitude Ramiseto
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Minozzo
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Repower Camping Rio Bianco Cerreto Laghi
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2025-01-06
Uploaded by ForumElettrico.it on 2025-01-06
Uploaded by ForumElettrico.it on 2025-01-06
Uploaded by ForumElettrico.it on 2025-01-06