Electra charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Electra https://www.go-electra.com
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]E' posta nel parcheggio dove insistono Aldi, Roadhouse e palestra McFit fuori dalle sbarre che ulteriormente limitano una porzione del parcheggio. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-electra-high-power-verona-vr-viale-del-lavoro-23-t40016.html
https://www.forumelettrico.it/forum/colonnine-electra-high-power-verona-vr-viale-del-lavoro-23-t40016.html Comment by ForumElettrico.it 02/03/2025 13:49:14
Other Charging Locations
There are 9 matching results
Esselunga Fiera
2
6
Private - For Staff, Visitors or Customers
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Eni
2
8
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
AGSM - Via Righi
1
1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Unicredit Ex Mercato Ortofrutticolo
1
5
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
AGSM Fiera Di Verona
3
4
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Tesla Supercharger Verona - Crowne Plaza
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
AGSM Viale del Lavoro - Piazzale Fiera
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eataly
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Centro Commerciale ADIGEO
3
7
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2025-02-03
Uploaded by ForumElettrico.it on 2025-02-03
Uploaded by ForumElettrico.it on 2025-02-03
Uploaded by ForumElettrico.it on 2025-02-03
Uploaded by ForumElettrico.it on 2025-02-03