To edit, add comments or upload photos: Sign In
Ambatty Greens Resortcharging location
Nearest Address:
Bitangalla, near Coorg Golf links
Virajpet
Karnataka
571213
India
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
2
Usage:
Public
Usage Cost:
22/kWh
Operational Status:
Operational
Latitude:
12.18228
Longitude:
75.828
OCM Ref: OCM-308780
Network/Operator
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
1 Present
OCM-CN-592234
25 kW
DC
CHAdeMO
Operational
1 Present
OCM-CN-592235
25 kW
DC
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-592236
7.4 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 4 matching results
Urs Kar
opposite Bhagavati Temple, Kaikeri, Gonikoppa, Karnataka 571213
Gonikoppa
Karnataka
571213
India
View
5.22 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Kodagu Planter's Club
5.77 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Club Mahindra Resort - Virajpet
6.51 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
The Rove Kodagu
13.12 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In