MLIC-BLUE OAKS 915charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
ChargePoint http://www.chargepoint.net/ 1-408-841-4500
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
Type 1 (J1772)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
MLIC 915 915 EV1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
MLIC 915 915 EV2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
MLIC 925 925 EV2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
MLIC 925 925 EV1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
MLIC-BLUE OAKS
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Pleasant Grove Pointe
Public
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 1)
Roseville
Public - Membership Required
Planned For Future Date
Residence Inn By Marriott Rocklin Roseville
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Residence Inn by Marriott Rocklin Roseville - Tesla Destination
Public
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Upload your own photos for this location: Sign In