To edit, add comments or upload photos: Sign In
Neringa (5)charging location
Nearest Address:
Taikos g. 41
Nida
Lithuania
Usage:
Public - Membership Required
Operational Status:
Operational
Latitude:
55.30106
Longitude:
20.9865324
OCM Ref: OCM-310935
Data Provider:
Lithuanian Road Administration https://ev.lakd.lt/en/open_source
Note: This data is sourced automatically, changes should ideally be submitted to the data provider directly.
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Providers Ref:
1825
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-598682
22 kW
AC (Single-Phase)
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-598683
22 kW
AC (Single-Phase)
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-832205
22 kW
AC (Single-Phase)
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-832206
22 kW
AC (Single-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Nidos kempingas
0.2 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Guest house "Dvi Nidos"
0.67 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Neringa (7)
0.84 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Nida
0.9 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Preilos g. 97B | Partner
5.18 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Laiko Marios - 2k1
5.71 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Neringa (4)
8.75 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
PLTKINKU35_EDLT-12
13.21 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
PLTKINTV10_EDLT-13
13.62 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In