Plenitude charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Tutto ok fino a 99 kW e davanti alla colonnina troviamo subito un parco ed un supermercato mentre dietro un bar e gelateria. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-plenitude-ultra-fast-monserrato-ca-via-monte-arci-t42280.html
https://www.forumelettrico.it/forum/colonnina-plenitude-ultra-fast-monserrato-ca-via-monte-arci-t42280.html Comment by ForumElettrico.it 05/17/2025 05:39:43
Other Charging Locations
There are 9 matching results
Enel X - Viale Vienna
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ewiva Conad Jenner
1
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ewiva McDonald's
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ewiva Conad Valenzani
1
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Palazzo Comunale
Public
Operational
Level 1 : Low (Under 2kW)
Unknown
Enel X - Viale Guglielmo Marconi
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
EnelX Piazza Boiardo
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Best Western Hotel Residence Italia
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Ewiva Q8
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2025-05-17
Uploaded by ForumElettrico.it on 2025-05-17
Uploaded by ForumElettrico.it on 2025-05-17
Uploaded by ForumElettrico.it on 2025-05-17
Uploaded by ForumElettrico.it on 2025-05-17