Plenitude Civagocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Situata nella via appena sotto la chiesa, fra un bar ed un ristorante hotel. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-plenitude-22-kw-villa-minozzo-re-via-ca-del-ponte-1-civago-t42543.html
https://www.forumelettrico.it/forum/colonnina-plenitude-22-kw-villa-minozzo-re-via-ca-del-ponte-1-civago-t42543.html Comment by ForumElettrico.it 06/09/2025 05:45:54
Other Charging Locations
There are 9 matching results
Plenitude San Pellegrino in Alpe
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Via Quattro Novembre 17
1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Minozzo
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hera Pievepelago
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Plenitude Villa Minozzo
2
6
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Plenitude Ligonchio
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Via Europa
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
INCOOP
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Villa Raffaelli
Privately Owned - Notice Required
Operational
Level 1 : Low (Under 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2025-06-09
Uploaded by ForumElettrico.it on 2025-06-09
Uploaded by ForumElettrico.it on 2025-06-09
Uploaded by ForumElettrico.it on 2025-06-09
Uploaded by ForumElettrico.it on 2025-06-09