Klaus Parking Systems Atlanticcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
EVGateway http://evgateway.com/ +1 949-945-2000
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
376496
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
OBE GARDENS RES SW
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
WHOLE FOODS MKT NORTHMIAMI ST 1
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
OBE CITY N MIAMI
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Towers at Quayside
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
The Towers of Quayside Condominium Association
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Target - Tesla Supercharger
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
FPL EVOLUTION MIAMISHORES1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Villa Sole
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
FPL EVOLUTION MIAMI SHORES 1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In