Fairfield Inn & Suites Tustincharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
eVgo Network https://www.evgo.com/
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
373031
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CHAdeMO
kW power is an estimate based on the connection type
CCS (Type 1)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Fairfield Inn & Suites Tustin
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
FREEWAY HONDA
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
SCHOOLSFIRST RH PARKING 5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
SCHOOLSFIRST TUSTIN BRANCH
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
FREEWAY HONDA CPE250
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
SCHOOLSFIRST RH PARKING 14
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
SCHOOLSFIRST RH PARKING 15
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
SMA SMA STATION #2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
SMA SMA STATION #1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In