11209 Richlandcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily Public - Credit card at all times
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
398573
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
2440 S Sepulveda Blvd
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Expo-Sepulveda
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
2431 S Sepulveda Blvd
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
11332 Exposition Blvd
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
2900 S Sepulveda Blvd
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
LADWP - Sepulveda Substation
Public
Level 3: High (Over 40kW)
CHAdeMO
10928 W Pico Blvd
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
DS-145
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
LADWP - Distributing Station 145
Public
Temporarily Unavailable
Level 3: High (Over 40kW)
CHAdeMO
Upload your own photos for this location: Sign In