Bakersfield Marriottcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
EVGateway http://evgateway.com/ +1 949-945-2000
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
376439
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
CHAdeMO
kW power is an estimate based on the connection type
CCS (Type 1)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Bakersfield Marriot
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
CITY OF BKRSFLD MECHANICS BANK1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
CITY OF BKRSFLD AQUATICCENTER4
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
City of Bakersfield - Amtrak Parking
Public
Temporarily Unavailable
Level 1 : Low (Under 2kW)
Unknown
City Hall South Annex
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
CITY OF BKRSFLD CITYHALLSOUTH1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
CITY OF BKRSFLD 18TH EYE9
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
CITY OF BKRSFLD 18TH EYE10
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
KERN FEDERAL CU
Public
Operational
Level 2 : Medium (Over 2kW)
CHAdeMO
Upload your own photos for this location: Sign In