Modern Ford of Boonecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
390535
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 1)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Modern Ford of Boone
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
LaQuinta Boone
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Sleep Inn Boone
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
MODERN TB MODERN TOYOTA
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Appalachian State University - Legends Parking Lot
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
New River Light and Power
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Boone Town Parking
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Appalachian State University - Rivers Street Parking Deck
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
W King St Parking
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In