Wexlercharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily Public - Credit card at all times
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
399222
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
SCUSD Central Kitchen
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
SACRAMENTO TAHOEPARK-02
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Target T2492 4th Avenue
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
PLACEHOLDER
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
SMUD Customer Parking Lot
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Autel (1 port 80A)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Sacramento Municipal Utility District
1
2
Public
Partly Operational (Mixed)
Level 3: High (Over 40kW)
CCS (Type 1)
Power Inn High Speed EV Charging
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
CAMPUS EV NORTH
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In