UT Paper Boxcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
349794
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
CCS (Type 1)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Utah Paper Box
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
PUBLIC USE
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
PUBLIC USE INTL PEACE GARD
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
PUBLIC USE SORENSON MULTIC
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
LARRY H. MILLER SUPER FORD 3
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Salt Lake City, Ut - South 300 West Supercharger
7
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Tesla Service Center - Tesla Supercharger
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
LARRY H. MILLER SUPER FORD 1
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Target Salt Lake City #T2641
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Upload your own photos for this location: Sign In