NJ-504LIV-NORWcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
331402
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
22 Paris Ave Poweral
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
The Jewish Home at Rockleigh
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Closter Plaza
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Closter Plaza
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
CLOSTER EV STATION 01
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Depot Square
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Rockland Country Club
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Borough of Demarest - Department Of Public Works
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Borough of Demarest
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In