Holiday Inn Express Sturbridgecharging location
24 hours daily
eVgo Network https://www.evgo.com/
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
228781
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CHAdeMO
kW power is an estimate based on the connection type
CCS (Type 1)
kW power is an estimate based on the connection type
Other Charging Locations
There are 9 matching results
Holiday Inn Express Sturbridge
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Sturbridge Meadows North
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Sturbridge Meadows South
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Sturbridge, MA
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Noble Energy Real Estate Holdings - Sturbridge Travel Plaza
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
113 Main Street Sturbridge MA
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Southern New England Ministry Network
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Big Bunny Market
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
APPLEGREEN STATION 1
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Upload your own photos for this location: Sign In