The Lodge at Grist Iron Brewing Co.charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
157970
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Grist Iron Brewing Co. + Lodge
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Lakewood Vineyards - Lakewood Vineyards
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Finger Lakes Waterfall Resort Motel & Cabins
Public - Notice Required
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Village of Burdett
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
The FLX Wienery - Tesla Destination
Public
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
The FLX Wienery
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
The FLX Wienery
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Anchor Inn and Marina
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
EVolve NY Watkins Glen
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Upload your own photos for this location: Sign In