Pinto Construction Cocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Red E Charge https://www.redecharge.com/
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
396996
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Bear Metal Works
1
1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Apartments at the Lyceum
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Tops Friendly Markets - Tesla Supercharger
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
GLPIZZA.COM GL PIZZA RIGHT
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Smiling Ted’s Quality Used Car
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
1890 Bailey Ave
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
799 SENECA STATION 4
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
799 SENECA STATION 6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Larkinville
1
3
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In