950 Walkers Linecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Chargelab https://www.chargelab.co/
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
397519
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
BURL MAZDA MAZDA P-L
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
HALTON HONDA FAST CHARGER
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
MWLLP MONHOPE EVSE 1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
SWTCH Energy Inc.
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Peak Power Inc
Private - Restricted Access
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Burlington Nissan
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Kamisa Investments
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Burlington Nissan - Fast Charger
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Burlington Nissan
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In