Essex Powerlines Corpcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
386532
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Peter Boyer GM - DC FAST
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Petro-Canada - Napanee
1
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Tesla/NACS Supercharger - Napanee
Public - Membership Required
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Flo - Canadian Tire - Napanee
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Napanee
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Hwisel - Hampton Inn
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Hampton Inn
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
FLO - Speedway Gas
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CHAdeMO
Speedway Gas
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Upload your own photos for this location: Sign In