Tous les jourscharging location
Planned for future date. Not Operational.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
208801
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 1)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
RECHARGECO SAINT-HENRI 01
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
4039 Notre-Dame
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
4039 Notre-Dame
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
810 Agnès
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
810 Agnès
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
74 Turgeon
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
74 Turgeon
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
3451 St-Jacques
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
3451 St-Jacques
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In