Tous les jourscharging location
Planned for future date. Not Operational.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
210387
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 1)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
IGA
Private - Restricted Access
Planned For Future Date
Level 3: High (Over 40kW)
CHAdeMO
RECHARGECO EDMUNDSTON 02-1
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
G&M Chevrolet (outside)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
The Power Commission of the City of St. John
Private - Restricted Access
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Edmunston Hyundai
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
MARTIN MAZDA CLIENTS
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Hotel Best Western Plus - Edmundston
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Best Western Plus Edmundston Hotel
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
The Power Commission of the City of St. John
Private - Restricted Access
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In