On the Run EV Fast Chargecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
349848
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 1)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Tim Hortons- Abbotsford
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
SD34 WAF-STATION 1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
CSC RHQ 801FLEET1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Princess Auto Abbotsford Location
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
ABBY
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Yale Secondary
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Abbotsford - Recreation Centre
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
ABBY ARC002
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
BC Hydro - Abbotsford - EcoDairy
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Upload your own photos for this location: Sign In