Jack Carter Chevrolet 2charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
For fleet use only
InCharge (US) https://inchargeus.com/
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
377893
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 1)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
DRIVE THRU
Public
Level 3: High (Over 40kW)
CCS (Type 1)
South Centre VW - SmartDC
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
SPT SERVICE
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Deerfoot Inn and Casino
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
PRINCESS AUTO PAL 31 CAL STH
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
LCPF Realty Inc
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
SWTCH Energy Inc.
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Parkland Corp
Private - Restricted Access
Planned For Future Date
Level 3: High (Over 40kW)
CHAdeMO
On the Run EV Fast Charge
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Upload your own photos for this location: Sign In