Mobilita Elettrica S.r.l.charging location
Disponibile solo in orario di apertura da LUN a VEN 8.30-12.30 e 15.00-18.30 http://www.mobilitaelettrica.it/colonnina-elettrica.html
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign InRating: 5 out of 5 [ General Comment , Charged Successfully ]3x22 kw free, very simple
Comment by StefanBElettrica 09/24/2019 12:36:10
[ General Comment , Charged Successfully ] https://www.forumelettrico.it/forum/colonnina-mobilitaelettrica-a-poggio-piccolo-t3960.html Comment by ForumElettrico.it 11/11/2018 16:47:00
[ General Comment , Failed to Charge (Equipment Problem) ]passato ieri e trovato tutti i cancelli chiusi: era un sabato nell'ora di pranzo
Comment by ForumElettrico.it 07/16/2017 05:29:18
Other Charging Locations
There are 9 matching results
Free To X AdS Sillaro Est
5
13
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Castel Guelfo The Style Outlets
1
4
Private - For Staff, Visitors or Customers
Planned For Future Date
Free To X AdS Sillaro Ovest
2
9
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge The Style Outlets
1
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ewiva The Style Outlets Poggio Piccolo
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Castel San Pietro Terme Parcheggio Ospedale | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Castel San Pietro Terme Parcheggio cimitero | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
CONAD Medicina | EnelX
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Castel San Pietro Terme Piscina Comunale | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2018-11-11
Uploaded by ForumElettrico.it on 2018-11-11
Uploaded by ForumElettrico.it on 2018-11-11
3 Colonnine 22 kw, libere, gratis!!
Uploaded by StefanBElettrica on 2016-11-27