To edit, add comments or upload photos: Sign In
Stokholtbuen (PowerGo)charging location
Nearest Address:
Stokholtbuen 17
Herlev
2730
Denmark
Usage:
Public - Membership Required
Operational Status:
Operational
Latitude:
55.73533630371094
Longitude:
12.408061981201172
OCM Ref: OCM-456644
Network/Operator
PowerGo https://www.powergo.energy
Data Provider:
PowerGo https://www.powergo.energy/
Data License:
Licensed under CC0 by data sharing agreement
Providers Ref:
25520
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-766586
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-766587
12.7 kW
AC (Three-Phase)
230 V
32 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Botilbuddet Rødbo (PowerGo)
0.27 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Klausdalsbrovej, Herlev
0.47 Miles
Unknown
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Unknown
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
DTU diplom
0.53 Miles
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
CHAdeMO
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
CHAdeMO
Q8 Herlev
0.76 Miles
Level 3: High (Over 40kW)
Type 2 (Socket Only)
Level 3: High (Over 40kW)
Type 2 (Socket Only)
Skovlundehallen (PowerGo)
0.98 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Meterbuen 27
1.17 Miles
Operational
Level 3: High (Over 40kW)
CHAdeMO
Operational
Level 3: High (Over 40kW)
CHAdeMO
Brydehuset (PowerGo)
1.33 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Herlev Bygade
1.36 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Herlev Hospital
1.36 Miles
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In