To edit, add comments or upload photos: Sign In
Køkkenet (PowerGo)charging location
Nearest Address:
Lokesvej 12
Hillerød
3400
Denmark
Usage:
Public - Membership Required
Operational Status:
Operational
Latitude:
55.92923355102539
Longitude:
12.257528305053711
OCM Ref: OCM-456709
Network/Operator
PowerGo https://www.powergo.energy
Data Provider:
PowerGo https://www.powergo.energy/
Data License:
Licensed under CC0 by data sharing agreement
Providers Ref:
27453
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-766851
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-766852
12.7 kW
AC (Three-Phase)
230 V
32 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Tesla Supercharger Hillerød
0.26 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Børnehuset Labyrinten (PowerGo)
0.91 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
ACE0123501
1.26 Miles
Unknown
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Unknown
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Larsen biler
1.28 Miles
Unknown
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Unknown
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Trollesbro (PowerGo)
1.32 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Børnehuset Kildedalen (PowerGo)
1.55 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Milnersvej 42
1.62 Miles
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Favrholm Station DC (PowerGo)
2.52 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Favrholm Station AC (PowerGo)
2.53 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In