To edit, add comments or upload photos: Sign In
Beyond Juicecharging location
Nearest Address:
21110 Mack Ave
Grosse Pointe Woods
MI
48236
United States
313-262-6722
Number Of Stations/Bays:
4
Usage:
Public
Operational Status:
Operational
Latitude:
42.448599803869
Longitude:
-82.9052612795
OCM Ref: OCM-458660
Network/Operator
Red E Charge https://www.redecharge.com/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 1)
Partly Operational (Mixed)
4 Present
OCM-CN-771028
160 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Harper Business Suites
0.66 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Wine Garden St Clair Shores
0.96 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Genesis Cadillac
1.28 Miles
Public
Temporarily Unavailable
Level 3: High (Over 40kW)
CCS (Type 1)
Public
Temporarily Unavailable
Level 3: High (Over 40kW)
CCS (Type 1)
Realtor Ryan Lally, KW Grosse Pointe / Great Lakes - Tesla Destination
1.28 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Public
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Roy O'Brien Ford
1.3 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Bank Of America - Electrify America
1
1.48 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Fishbones SCS
1.52 Miles
Public
Temporarily Unavailable
Level 3: High (Over 40kW)
CCS (Type 1)
Public
Temporarily Unavailable
Level 3: High (Over 40kW)
CCS (Type 1)
Detroit Furnace
2.76 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Eastpointe City Hall
2.88 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In