Hampton Inn Shelby Townshipcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Red E Charge https://www.redecharge.com/
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
400295
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Marathon - Shelby Township
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Shelby Pit Stop
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
CLEANVIEW VACUUM 9
1
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Kroger 7644 26 Mile Road
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
LOMBARDO ARIA STATION
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
MISCPRODUCTS CT4021-1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Exxon Utica
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
SM SUNSHINE SH
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
SM SUNSHINE UTICA
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In