Kirtland Community Collegecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Red E Charge https://www.redecharge.com/
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
400217
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
2384 I-75BL (US-7XW-PLL-1B)
1
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Feeny Ford of Grayling
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Dairy Queen
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Downtown Grayling Public Parking
2
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
North Higgins Lake State Park
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Cross Country Ski Headquarters
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
CAMPGROUND EV1$ CAMPGROUND
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Hartwick Pines State Park
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
South Higgins Lake State Park
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In