To edit, add comments or upload photos: Sign In
Milence (Estacionamiento Camiones)charging location
Nearest Address:
zaragoza
Zaragoza
Spain
General Information:
Trucks and buses only
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
4
Usage:
Public - Pay At Location
Usage Cost:
0,39€/kWh
Operational Status:
Operational
Latitude:
41.639884021074806
Longitude:
-1.0082099182119464
OCM Ref: OCM-460238
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
4 Present
OCM-CN-774273
400 kW
DC
1000 V
600 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Ronda del Ferrocarril (Atlante)
0.75 Miles
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Hotel Diagonal Plaza
0.82 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Repsol Diagonal Plaza
0.92 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Tesla Supercharger Zaragoza
2
0.97 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hotel Plaza Feria
2
0.97 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
E.S. El Cisne I
1
0.98 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
McDonald's Plaza
1.08 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Amazón
1.08 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Rest. El Cisne (Zunder)
1.09 Miles
Public
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In