IPlanet AdS Cascina Gobba Ovestcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Situata nell'area di servizio e dotata di due connettori CCS Combo 2 da 100 kW, subito davanti a diverse HPC più potenti e di altro gestore. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-iplanet-high-power-ads-cascina-gobba-ovest-mi-a51-tang-est-km-20-verso-sud-t40406.html
https://www.forumelettrico.it/forum/colonnine-iplanet-high-power-ads-cascina-gobba-ovest-mi-a51-tang-est-km-20-verso-sud-t40406.html Comment by ForumElettrico.it 10/04/2025 16:08:47
Other Charging Locations
There are 9 matching results
Atlante AdS Cascina Gobba Ovest
1
1
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Eneldrive Ospedale San Raffaele
1
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eneldrive Milano 2
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
NH Hotel Milano 2
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Unknown
Eneldrive Milano 2
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
LIDL Milano Adriano
1
3
Public
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eneldrive Parcheggio Via Olgia
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Friem
1
4
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Sesto San Giovanni Adriano | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2025-10-04
Uploaded by ForumElettrico.it on 2025-10-04
Uploaded by ForumElettrico.it on 2025-10-04
Uploaded by ForumElettrico.it on 2025-10-04
Uploaded by ForumElettrico.it on 2025-10-04