Emotion AdS Scaligera Sudcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CHAdeMO
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Equipment & Location Confirmed Correct ]Dotata di un CCS Combo 2 da 90 kW, un CHAdeMO e un cavo Tipo 2 da 22 kW. Si trova dopo l'autogrill e dopo le pompe di benzina, attaccata all'ingresso del bar Momento. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-emotion-fast-ads-scaligera-sud-verona-vr-a4-km-301-verso-trieste-t44112.html
https://www.forumelettrico.it/forum/colonnina-emotion-fast-ads-scaligera-sud-verona-vr-a4-km-301-verso-trieste-t44112.html Comment by ForumElettrico.it 10/28/2025 06:18:39
Other Charging Locations
There are 9 matching results
Plenitude AdS Scaligera Nord
1
2
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
NEOGY Viale della Vittoria
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X McDonald's Villabella
2
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
NEOGY Via San Matteo
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
NEOGY Piazza Costituzione
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
NEOGY Via Covergnino
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
NEOGY Via Luigi Adami
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Residenza Ai Capitelli
Public - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
San Bonifacio centro
2
9
Public
Operational
Level 2 : Medium (Over 2kW)
Unknown
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2025-10-28
Uploaded by ForumElettrico.it on 2025-10-28
Uploaded by ForumElettrico.it on 2025-10-28
Uploaded by ForumElettrico.it on 2025-10-28
Uploaded by ForumElettrico.it on 2025-10-28