To edit, add comments or upload photos: Sign In
Interparking Torrentcharging location
Nearest Address:
Torrent
Torrent
Spain
Number Of Stations/Bays:
10
Usage:
Public - Pay At Location
Usage Cost:
0,40€/kWh + parking fee
Operational Status:
Operational
Latitude:
39.43576071489264
Longitude:
-0.46732546901648675
OCM Ref: OCM-462493
Network/Operator
Interparking (ES) https://www.interparking.es/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Operational
10 Present
OCM-CN-777920
8 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Ayunt. Torrent. Parking Plaza Colón
0.2 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Mercadona Torrent
0.26 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Mercadona Torrent Iturbi
0.36 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ayunt. Torrent
1
0.43 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Dia Torrent
0.44 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ayunt. Torrent Plaça de la Unió Musical
1
0.44 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ayunt. Torrent
1
0.47 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Consum Torrent
1
0.51 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Parking Plaza de la Concordia
0.57 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Upload your own photos for this location: Sign In