To edit, add comments or upload photos: Sign In
Posto AP São Luís - RJ Eletropostoscharging location
Nearest Address:
Rod. Lucio Meira, Nº 299 Km13 BR 393
Volta Redonda
Brazil
Usage:
Public - Membership Required
Operational Status:
Operational
Latitude:
-22.47256
Longitude:
-44.060532
OCM Ref: OCM-464015
Data Provider:
Easy Volt https://www.ezvolt.com.br
Note: This data is sourced automatically, changes should ideally be submitted to the data provider directly.
Data License:
CC-0
Providers Ref:
019a4b29-aebf-7dd3-96de-34e5323f8498
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
1 Present
OCM-CN-780768
60 kW
DC
380 V
200 A
CCS (Type 2)
Operational
1 Present
OCM-CN-780769
60 kW
AC (Single-Phase)
220 V
32 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 6 matching results
Posto AP Rod. dos Metalúrgicos - RJ Eletropostos
3.59 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Posto Aliança - Volta Redonda
4.35 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Posto AP Barbará - RJ Eletropostos
7.16 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Rodovia Presidente Dutra - Pista Lateral
8.67 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
CCS (Type 2)
Posto Nacional
14.54 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Posto Mamão
14.54 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In