HCP SAN DIEGO 7473 LUSK – 1charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
ChargePoint http://www.chargepoint.net/ 1-408-841-4500
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
181154
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
HCP SAN DIEGO 7473 LUSK - 2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
HQP 4902-5
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Parallel Capital Partners, Inc.
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Sorrento Heights
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
PRIMROSEBIO EVC2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
PFENEX INC.
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
JOHN HANCOCK 10180 EV 1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
HCP SAN DIEGO 4921DIRECTORS 2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Visitors Parking
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In