MARTA GOLDSMITH L2 3charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
ChargePoint http://www.chargepoint.net/ 1-408-841-4500
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
420756
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
MARTA GOLDSMITH L2 1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
MARTA GOLDSMITH L2 5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
DEKALB COUNTY FLEET
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Atlanta Evergreen Marriott Conference Resort
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Atlanta Evergreen Marriott Conference Resort - Tesla Destination
Public
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
The Centre on Hugh Howell - Tesla Supercharger
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
GEORGIA POWER CLARKSTON DC2
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
GEORGIA STATE GSU CLARKSTON
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
GEORGIA POWER CLARKSTON DC1
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Upload your own photos for this location: Sign In