Morningside Parkcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Dawn to dusk
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
417478
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Pellissippi State
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Pellissippi State (Magnolia Ave)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Caswell Park
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Stockyard Lofts
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Knoxville Auditorium & Coliseum Parking Garage A
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Civic Coliseum Parking Garage
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Civic Auditorium & Coliseum Garage
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Three Rivers Market
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Downtown Knoxville
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Upload your own photos for this location: Sign In