Safeway San Mateo (El Camino) #0970charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
eVgo Network https://www.evgo.com/
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
416929
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 1)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Safeway - San Mateo
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
1300 S ELCM
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
ESSEX PARK GREEN 10
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
ESSEX PARK GREEN 4
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
PUBLIC CHARGERS
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
PUBLIC CHARGERS CITY HALL
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
ESSEX PARK GREEN 12
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
ESSEX PARK GREEN 02
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
ESSEX PARK GREEN 5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In