To edit, add comments or upload photos: Sign In
BPCL Royal Fuel Stationcharging location
Nearest Address:
6GF2+P9M, Kaladhungi Rd, Shiv Puram Phase -I
Unchapul
Haldwani
Uttarakhand
263139
India
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
1
Usage:
Public - Pay At Location
Usage Cost:
14.0
Operational Status:
Temporarily Unavailable
Latitude:
29.22417745217187
Longitude:
79.50104336869471
OCM Ref: OCM-469383
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Temporarily Unavailable
1 Present
OCM-CN-787920
30 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 5 matching results
Bikanerwala Sweets Haldwani (Aargo)
1.75 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
CCS (Type 2)
Public
Operational
Level 2 : Medium (Over 2kW)
CCS (Type 2)
Fortune Walkway Mall
2.57 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Bharat Petroleum - Janta Petrol Pump
2.86 Miles
Public
Temporarily Unavailable
Public
Temporarily Unavailable
Shree Bihariji Filling Station
3.31 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Tata Power - Electric Vehicle Charging Station
4.37 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In