To edit, add comments or upload photos: Sign In
Bernie's of Roscrea SuperValucharging location
Nearest Address:
R421
Roscrea
Co. Tipperary
Ireland
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
2
Usage:
Public - Membership Required
Operational Status:
Planned For Future Date
Latitude:
52.956431380420725
Longitude:
-7.800620572433218
OCM Ref: OCM-469862
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
2 Present
OCM-CN-788752
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Supervalu Car Park
0.04 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Roscrea Centre Car Park
0.13 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Circle K Roscrea
3
0.7 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Racket Hall Country House
1.71 Miles
Public - Membership Required
Not Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Not Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Killavilla Community Centre
2.37 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Coolderry Community Hall
4.25 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Shinrone
5.57 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Barack Obama Plaza
7.77 Miles
Public - Membership Required
Planned For Future Date
Public - Membership Required
Planned For Future Date
Obama Plaza, M7, Moneygall
7.8 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In