Garda Uno charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Neogy https://www.neogy.it/ 800 832 855
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Tutto ok sulla presa di sinistra ma essendo la colonnina situata vicino alla Palestra Comunale, può essere facilmente abusata durante gli eventi sportivi. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-garda-uno-22-kw-pontevico-bs-via-cavalieri-di-vittorio-veneto-13-t44511.html
https://www.forumelettrico.it/forum/colonnina-garda-uno-22-kw-pontevico-bs-via-cavalieri-di-vittorio-veneto-13-t44511.html Comment by ForumElettrico.it 11/30/2025 17:57:39
Other Charging Locations
There are 9 matching results
Enel X Conad
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Atlante Casello
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
GardaUno Comune di Verolanuova
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
CONAD Verolanuova | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Verolavecchia Laini | EnelX
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
29 Via Circonvallazione
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Verolavecchia Piazza Caccia | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
A2A Seniga
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Comune Bordolano 2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2025-11-30
Uploaded by ForumElettrico.it on 2025-11-30
Uploaded by ForumElettrico.it on 2025-11-30
Uploaded by ForumElettrico.it on 2025-11-30