To edit, add comments or upload photos: Sign In
Joy Energy - Recifecharging location
Nearest Address:
Rua Manoel de Brito
Pina
Pernambuco
51110-100
Brazil
Number Of Stations/Bays:
1
Usage:
Public - Pay At Location
Usage Cost:
R$1,99 Kwh + R$1,00 min ocioso (tolerância 15 min)
Operational Status:
Operational
Latitude:
-8.086792905969133
Longitude:
-34.888344050697015
OCM Ref: OCM-470951
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
2 Present
OCM-CN-790999
60 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Avenida República Árabe Unida
0 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Audi Center
2.16 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Volvo - Concessionária Rota Premium - Recife
2.23 Miles
Public - Membership Required
Not Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Not Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Posto Tancredo Neves - BR
2.76 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
LOCKTUDO- OLINDA-PE
4.17 Miles
Unknown
Level 2 : Medium (Over 2kW)
Unknown
Unknown
Level 2 : Medium (Over 2kW)
Unknown
Avenida Barão de Bonito
5.45 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Posto Ayrton Senna - Jabotão dos Guararapes
6.68 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Posto Pichilau Jaboatão - Corredor Verde Neoenergia
7.53 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Auto Variedades | Abreu e Lima - PE
12.13 Miles
Unknown
Level 2 : Medium (Over 2kW)
Unknown
Unknown
Level 2 : Medium (Over 2kW)
Unknown
Upload your own photos for this location: Sign In