To edit, add comments or upload photos: Sign In
Casa Rural Font d'en Torrescharging location
Nearest Address:
Morella
Morella
Spain
Number Of Stations/Bays:
2
Usage:
Private - For Staff, Visitors or Customers
Usage Cost:
0,37€/kWh
Operational Status:
Operational
Latitude:
40.639952628802405
Longitude:
-0.0461299101007171
OCM Ref: OCM-471922
Network/Operator
Electromaps https://www.electromaps.com/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Operational
2 Present
OCM-CN-792583
22 kW
AC (Three-Phase)
400 V
32 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Ayunt. Morella
1
3.05 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Puerta de San Miguel, Morella
3.13 Miles
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Taller Julio Ortí
3.33 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ayunt. Vallibona
5.42 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hostatgeria Sant Jaume
7.69 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Ayunt. Zorita de Maestrazgo
8.67 Miles
Public
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ayuntamiento Peñarroya de Tastavins
1
9.09 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Todella
10.5 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Consolación. A Delicious Hotel & Restaurant
11.24 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Upload your own photos for this location: Sign In