Fera Eletropostocharging location
Eletroposto Fera — carregamento rápido DC 80kW para veículos elétricos, 24 horas por dia, 7 dias por semana. Localizado em São José dos Pinhais/PR, com acesso direto pela BR-376, ideal para motoristas em viagem entre Curitiba e o litoral. Conector CCS2. Sem necessidade de agendamento. Estacionamento coberto durante a recarga.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 100 out of 100
- User Feedback - Has recent user verification
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Add your own comment/check-in for this location:
Sign InRating: 5 out of 5 [ General Comment , Charged Successfully ]Excelente carregador. Carregando a 80kw. Local com banheiro e muito seguro. R$1,85 o kw. Recomendo demais!
Comment by Richard Pierosan 03/31/2026 19:55:03
[ General Comment , Charged Successfully ] Comment by Richard Pierosan 03/31/2026 19:52:08
Other Charging Locations
There are 9 matching results
Hotel Slaviero Essential - Zletric
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Vale Sul
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Estação Maru
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Posto Pelanda 27
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Alumifix Solar
Private - For Staff, Visitors or Customers
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
002 BYD Matriz 40 kW
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
BYD | Servopa Rebouças - 01
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Cia Charge | 120KW | Tic Posto - Curitiba
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Eletroposto CNF - Nogueira
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by Richard Pierosan on 2026-05-21
Uploaded by Richard Pierosan on 2026-05-21