To edit, add comments or upload photos: Sign In
Repsol Nueva Carteyacharging location
Nearest Address:
Nueva Carteya
Nueva Carteya
Spain
Number Of Stations/Bays:
1
Usage:
Public - Membership Required
Usage Cost:
0.48€/kWh
Operational Status:
Operational
Latitude:
37.59303743040073
Longitude:
-4.481603662368457
OCM Ref: OCM-473132
Network/Operator
Repsol - Ibil (ES) https://www.repsol.es/particulares/vehiculos/movilidad-electrica/ 902 540 810
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - Has recent user verification
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
1 Present
OCM-CN-794608
50 kW
DC
400 V
125 A
CHAdeMO
Operational
1 Present
OCM-CN-794609
50 kW
DC
500 V
125 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-794610
43 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Ayunt. Nueva Carteya
1
0.95 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
LUQUE ECOLOGICO
6.3 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Polígono Industrial el Alcaparral
1
6.96 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Rest. Alcazaba - El Espejo
1
7 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Repsol La Molinera
1
7.13 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hotel Mitra
1
7.57 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hotel Mencia Subbetica
7.75 Miles
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Rest. La Cantina
7.82 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Estación de Autobuses (Cabra)
1
8.34 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)