To edit, add comments or upload photos: Sign In
PowerDot - Action - Savigny-le-Templecharging location
Nearest Address:
3 Allée du Cobalt
Savigny-le-Temple
77176
France
Number Of Stations/Bays:
4
Usage:
Public
Operational Status:
Operational
Latitude:
48.584754815509825
Longitude:
2.5927609200507504
OCM Ref: OCM-475051
Network/Operator
Power Dot https://powerdot.fr/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
3 Present
OCM-CN-797501
120 kW
DC
CHAdeMO
Operational
1 Present
OCM-CN-797502
50 kW
DC
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-797503
22 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Auchan MELUN SENART
0.31 Miles
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CHAdeMO
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CHAdeMO
Tesla Supercharger Cesson
0.51 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
LM - Cesson
0.75 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Savigny-le-Temple
0.95 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
e-Vadea - Réau - A5a Plessis Picard
1.24 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Syndicat intercommunal (Mairie) - Cesson - 22kW AC
1.26 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Nandy
1.29 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Cesson
1.61 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Impasse Dionet
1.65 Miles
Operational
Level 3: High (Over 40kW)
CHAdeMO
Operational
Level 3: High (Over 40kW)
CHAdeMO
Upload your own photos for this location: Sign In