To edit, add comments or upload photos: Sign In
PowerDot - Marie Blachère - Oyonnaxcharging location
Nearest Address:
27 Cours de Verdun
La Forge
Oyonnax
Auvergne-Rhône-Alpes
01100
France
Number Of Stations/Bays:
4
Usage:
Public
Operational Status:
Operational
Latitude:
46.26733474641935
Longitude:
5.655730407652982
OCM Ref: OCM-475362
Network/Operator
Power Dot https://powerdot.fr/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
4 Present
OCM-CN-798191
120 kW
DC
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-798192
22 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Nouvel Hôtel
0.42 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Bump - Intermarché Hyper - Arbent
1.1 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ford Oyonnax
1.26 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Camping le Valserine
10.29 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ford Saint Claude
11.38 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Mobilize - Renault Valserhône
12.59 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ionity Ceignes Haut Bugey
1
13.01 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
TotalEnergies - Relais Ceignes Cerdon
13.13 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Bellegarde-sur-Valserine
13.76 Miles
Operational
Level 3: High (Over 40kW)
Type 2 (Tethered Connector)
Operational
Level 3: High (Over 40kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In