To edit, add comments or upload photos: Sign In
Спортивный комплекс ИванАвецcharging location
Nearest Address:
ул. Шоссейная, стр. 54
д. Энколово
188660
Russian Federation
Usage:
Public - Membership Required
Operational Status:
Operational
Latitude:
60.111116
Longitude:
30.444943
OCM Ref: OCM-478082
Network/Operator
Punkt-E https://punkt-e.ru/ +78002223700
Data Provider:
Punkt-E https://punkt-e.ru/
Note: This data is sourced automatically, changes should ideally be submitted to the data provider directly.
Data License:
Licensed under CC0 by data sharing agreement
Providers Ref:
78515
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
GB-T AC - GB/T 20234.2 (Socket)
Operational
1 Present
OCM-CN-802786
22 kW
AC (Three-Phase)
688 V
32 A
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-802787
22 kW
AC (Three-Phase)
688 V
32 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Мега Парнас
2.7 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Мега Парнас
2.71 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
4702
3 Miles
Operational
Level 3: High (Over 40kW)
CHAdeMO
Operational
Level 3: High (Over 40kW)
CHAdeMO
Девяткино ТЦ
3.86 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EVT 382
3.88 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
СПб-Спарк DC150 Новое Девяткино
3.93 Miles
Public - Membership Required
Unknown
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Unknown
Level 3: High (Over 40kW)
CCS (Type 2)
Мурино
4.11 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Леруа Мерлен Парнас
4.62 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Перекрёсток Просвещения
5.33 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Upload your own photos for this location: Sign In