To edit, add comments or upload photos: Sign In
PowerDot - Basic Fit - Bessoncourtcharging location
Nearest Address:
Rue du Sarré
Bessoncourt
Bourgogne-Franche-Comté
90160
France
Number Of Stations/Bays:
8
Usage:
Public
Operational Status:
Operational
Latitude:
47.640426836784854
Longitude:
6.911273247605891
OCM Ref: OCM-478259
Network/Operator
Power Dot https://powerdot.fr/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
7 Present
OCM-CN-803159
100 kW
DC
CHAdeMO
Operational
1 Present
OCM-CN-803160
50 kW
DC
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-803161
22 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Ionity Bessoncourt
0.17 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Atlante - Bessoncourt - CCV Belfort
0.43 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PowerDot - Jour de Fête - Bessoncourt
0.46 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Parking de la concession
1.14 Miles
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Opel Belfort
1.79 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
place de la République
2.33 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Parking Rue Morimont
2.34 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
LECLERC BELFORT
2.37 Miles
Public
Operational
Level 3: High (Over 40kW)
Type 2 (Tethered Connector)
Public
Operational
Level 3: High (Over 40kW)
Type 2 (Tethered Connector)
Poste
2.47 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In